What we do

Industrial scaffolding.

Plant, tanks and the energy corridor. Inductions, permits and method statements handled before the wagon is loaded.

Scaffold to the rear of a rendered terrace, with a loaded wagon and bagged materials in the foreground.

Industrial access is mostly paperwork with some tube at the end of it. Plant, tanks, gantries and process structures along the energy corridor all come with inductions, permit-to-work systems and a site team who need the method statement days before anyone turns up.

That suits us. Years of working the industrial sites on this coast teaches you that turning up without the right paperwork means turning round again.

So the permits, the inductions and the RAMS are done before the wagon is loaded. When we arrive, we start.

What's included.

  • Access scaffolds to plant, tanks, vessels and pipe runs
  • Shutdown and turnaround work planned to your window, including nights and weekends
  • Birdcages inside process buildings where a floor-level platform is needed
  • Loading towers and material handling positions
  • Drawings and calculations for anything outside standard configurations
  • Dismantle scheduled to your programme so access is not holding the job up

How we stay compliant.

  • Inductions, permits to work and site-specific RAMS completed before mobilisation
  • CISRS card-carrying operatives, cards available for checking on arrival
  • TG20:21 compliant designs, with calculations where the structure is non-standard
  • CHAS and SMAS Worksafe accredited
  • Weekly inspections logged and issued to the site team

TG20:21 compliant working · Fully insured

Get a price

Price your scaffold today.

Tell us the job and roughly how big it is, and you get a price from the person who will build it. No estimator, no call centre, no scaffold you did not ask for.